Recent Planning Applications

The Barn Cottage Dean Chipping Norton Oxfordshire OX7 3LB

14th May 2026

Erection of a sunroom

The Barn Cottage Dean Chipping Norton Oxfordshire OX7 3LB

8th May 2026

Erection of outbuilding and greenhouse, with associated works

New Barn Farm Ditchley Park Enstone Chipping Norton Oxfordshire OX7 4EX

23rd April 2026

Discharge of condition 5 (external lighting) and 6 (biodiversity enhancements) of planning permission 25/02655/HHD

Hill Farmhouse Taston Chipping Norton Oxfordshire OX7 3JL

16th December 2025

Erection of single storey extension to rear of dwelling, erection of detached triple garage with office space above, and associated works

The Barn Cottage Dean Chipping Norton Oxfordshire OX7 3LB

12th December 2025

Erection of 1.5 storey side extension and single storey side extension. Construction of outdoor swimming pool to rear of property, and associated works

New Barn Farm Ditchley Park Enstone Chipping Norton Oxfordshire OX7 4EX

12th November 2025

External and internal alterations with addition of mezzanine level to allow for use of building for ancillary residential purposes.

New Barn Farm Ditchley Park Enstone Chipping Norton Oxfordshire OX7 4EX

12th November 2025

External and internal alterations with addition of mezzanine level to allow for use of building for ancillary residential purposes.

The Pyramid House Church Lane Spelsbury Chipping Norton Oxfordshire OX7 3JR

24th September 2025

Certificate of lawful Development (existing) for reroofing works, addition of Velux windows to annex and erection of a rear extension.

Taston Barn Taston Chipping Norton Oxfordshire OX7 3JL

29th August 2025

Variation of condition 2 of planning permission 25/00180/HHD to allow new window to West elevation of existing building, new ground floor window to South elevation of extension and new first floor covered balcony to West elevation of extension.

Wagon Wheel Cottage Charlbury Road Spelsbury Chipping Norton Oxfordshire OX7 3LG

5th August 2025

Conversion of existing outbuilding into living accommodation and replacement of existing carport

Hill Farmhouse Taston Chipping Norton Oxfordshire OX7 3JL

30th July 2025

Mature pine x2 - Fell to ground level.

1 Spelsbury Down Farm Cottages Dean Chipping Norton Oxfordshire OX7 3LD

28th June 2025

Sycamore - fell to ground level

Glebe Cottage Church Lane Spelsbury Chipping Norton Oxfordshire OX7 3JR

16th May 2025

Certificate of Lawfulness (Removal of existing rear conservatory and erection of a single storey rear extension)

1 Chadlington Road Spelsbury Chipping Norton Oxfordshire OX7 3JT

1st May 2025

T1 Sycamore - Fell to ground level
T2 Sycamore - Fell to ground level
T3 Cherry - Reduce all round by 1.5 -2 metres
T4 Goat Willow - Crown raise low lower branches to give c.4.5 metre clearance, reduce overextended growth on house side by 1.5 metr

Middle Farm Taston Chipping Norton Oxfordshire OX7 3JL

4th March 2025

Erection of stone structure to form as a tethering block for stock management (retrospective)

Corn Close Cottage Charlbury Road Spelsbury Chipping Norton Oxfordshire OX7 3JR

13th February 2025

Alterations to existing dwelling to include provision of Juliet balcony to bed 2 (West elevation), dormer window and Juliet balcony to bed 1 (South elevation), single s

Taston Barn Taston Chipping Norton Oxfordshire OX7 3JL

6th February 2025

Removal of garage door and part block up of opening, installation of new window, proposed external door, addition of a flue, erection of a garage and accommodation abov

Glebe Cottage Church Lane Spelsbury Chipping Norton Oxfordshire OX7 3JR

14th January 2025

Erection of two-storey side extension and single-storey rear extension.

Peartree Cottage Dean Chipping Norton Oxfordshire OX7 3LB

3rd December 2024

Internal and external alterations to include erection of two single storey extensions and entrance porch, along with alterations to the existing roof and reinstatement

Peartree Cottage Dean Chipping Norton Oxfordshire OX7 3LB

3rd December 2024

Erection of rear and side single storey extensions and entrance porch, along with alterations to the existing roof, reinstatement of dormer windows and changes to fenes

Dean Mill Dean Chipping Norton Oxfordshire OX7 3JX

7th May 2024

Discharge of condition 6 (full surface water drainage system) of planning permission 24/00709/S73.

Dean Mill Dean Chipping Norton Oxfordshire OX7 3JX

19th March 2024

Variation of condition 2 of Planning Permission 23/00643/FUL to reduce the size of building

8 Chadlington Road Spelsbury Chipping Norton Oxfordshire OX7 3JT

21st August 2023

Erection of side and rear two storey extensions, proposed front entrance canopy and roof lights

Stable End Spelsbury Chipping Norton Oxfordshire OX7 3JR

20th March 2023

Single storey extension. First floor extension to attach to existing garage building and formation of new dormer window. Two storey side extension to provide additional living space and garden store (previously approved 22/01761/HHD)

8 Chadlington Road Spelsbury Chipping Norton Oxfordshire OX7 3JT

16th March 2023

Erection of side and rear extensions and construction of a new entrance porch to front elevation